One custom home bid may be much lower because it leaves out work, assumes different fixtures or prices a different way of building something. The cheaper bid may still be cheaper, but you need to compare what’s included before you can tell. The same plans don’t automatically mean the same price for the same work.

Drywalled kitchen and dining space with a framed island knee wall leading toward glass patio doors and side windows, trim boards stacked at right.
Den & Burrow project photo

What could be missing from the lower bid?

You’re looking at the same plans, so it’s reasonable to ask: how are they that much different?

Sometimes a builder missed something. Sometimes a piece of work wasn’t included. Or one builder anticipated a different type of fixture than another. Those differences can leave a lot of distance between the numbers, even when both builders started with the same drawings.

A higher bid may also reflect a builder looking at a detail and deciding, this is the better way to do it, so that’s what we’re going to price. That deserves an explanation. A higher number alone doesn’t tell you that the approach is necessary or better for the home you want.

Ask each builder to explain the work and selections behind the price. You’re trying to find out where the bids actually differ, rather than guessing from the totals.

Colten Roth, co-founder of Den & Burrow, talking about why a low bid may be missing something
Colten Roth, Den & Burrow co-founder

How to compare the bids before choosing a builder

For a custom home in Lincoln, start with a written comparison. Ask both builders to clarify these items:

  • Included and excluded work. What does the price cover, and what will you still need to pay for separately? Ask specifically about preparing the property for the home.
  • Fixtures and materials. Are both bids based on the same selections? If something hasn’t been selected, what did each builder assume?
  • Allowances. An allowance is an amount set aside for something that hasn’t been fully selected or priced. Ask what each allowance covers and what happens if the selection costs more.
  • Construction details. If one builder recommends a different approach, ask what changes, why they recommend it and how it affects the price.
  • Unresolved costs. What still needs an answer, and how will that cost be determined?

Get those explanations in writing. If one bid includes an item and the other doesn’t, ask for the missing item to be priced before treating the difference as savings.

Is the cheaper bid really cheaper?

It can be. A lower price isn’t proof that something is wrong, just as a higher price isn’t proof that everything is covered.

The problem comes when the lower starting price grows as missing work or different selections get added. It may end up pretty much right there with the higher bid anyway. Even if it finishes a little lower, the original gap may have made the savings look much larger than they were.

A basement bathroom vanity with a white top and a four-light fixture above.
Den & Burrow project photo

Compare the cost of the home you intend to build, including work outside the quoted total. If a cost is still unknown, keep it visible as an unknown rather than treating it as zero.

Bring the budget into the design conversation

At Den & Burrow, we design and build custom homes in Lincoln, Nebraska. Builder input shapes the drawings, and live design sessions let us work through changes together in a 3D model.

The dream and the budget rarely line up without some decisions along the way. Talking through those decisions during design helps make clear what you want to build and what needs to be priced.

If you’re planning a custom home, contact Den & Burrow to discuss the design, the property and the budget together.